Hello and welcome to "Nantong UP Machinery Engineering Co., Ltd." website!
Your location :Home > News >
News
Products
News

Correct operation steps of bulk loader

First, check the vehicle:

1, check the fuel, cooling water and lubricating oil.

2, check the car, parking brake reliability.

3, check the bucket system operation load.

4, check the contents of the forklift truck and loader related projects.

Secondly,

Look around L. started before the confirmation of no obstacles impede safe driving after the first whistle, start again.

2 brake pressure gauge readings to achieve the required values can be started.

3 start can not be suddenly accelerated, should be a smooth start.

Third,

1 before and after driving the car body safety coupling rod, and properly keep.

2 when running on the ramp, the starting lever should be turned on, and the starting must be forward.

3 to change the driving direction and the transformation of the control lever must be carried out after the car stopped.

4 when the material is carried, the lower hinge point of the moving arm should be kept above ground 400mm. The bucket shall not be raised to the highest position to deliver materials.

5 to avoid the lateral traveling and shovel loading in the slope.


    Home  |  PRIVATE POLICY  |  About UP  |  Products  |  News  |  UP Video  |  Projects  |  Contact Us

    Copyright©: Nantong UP Machinery Engineering Co., Ltd. All Rights Reserved

    Fax: +86 513 88790811 Mob: +86 18751399228 E-mail: jsntup@163.com

    Add: No.6 Shuanggong Road, Qutang Town, Hai'an County, Nantong City, Jiangsu Province,China